What documentation do mortgage lenders and surveyors need to accept a spray foam remediation?

Mortgage lenders and RICS surveyors need a complete EBR-01 post-removal certification pack: proof that 100% of the spray foam was manually extracted, a timber and moisture condition report, controlled-waste disposal records, and an independent compliance certificate confirming the roof is mortgageable. This standardised documentation is what allows lenders to release retention and surveyors to clear the defect on a valuation.

Removal evidence
Documentation that 100% of foam was extracted with no residual bonding.
Timber report
RICS-aligned inspection confirming no rot, moisture, or structural damage.
Waste records
Licensed controlled-waste carrier duty-of-care certificates for all debris.
Compliance certificate
Independent EBR-01 certification that the property is mortgage-ready.
Reviewed by EBR-01 Compliance Panel · Last reviewed August 2026
[EBR-01 / LENDER TRUST]

Lender Trust & Surveyor Compliance

How the EBR-01 standard protects mortgage providers, banks, and surveyors — with a standardised compliance checklist for every certified spray foam removal.

Need a Lender-Accepted Compliance Pack for a Spray Foam Property?

Refer a case or request EBR-01 certification. We'll match the property with a certified contractor and produce the documentation your surveyor and lender require to proceed.

  • Matched with EBR-01 certified contractors in your area
  • Lender-accepted compliance documentation
  • Free property risk assessment included

Your details are confidential and used only to arrange your assessment.

Spray foam insulation has become one of the UK mortgage market's most significant valuation and lending risks. Many high-street lenders now decline or downvalue properties where foam is present in the roof space, and surveyors face growing pressure to evidence that any removal has been carried out to a verifiable standard.

The EBR-01 Code of Conduct exists to close that gap. Every certified removal under our standard produces a consistent, independently verified documentation pack — giving mortgage providers, banks, and RICS surveyors the assurance they need to proceed with confidence.

Six Layers of Lender Protection

Mortgage-Compliant Documentation

Every EBR-01 certified removal produces a standardised documentation pack that satisfies lender requirements for evidence of safe, complete foam extraction — no ad-hoc contractor reports to chase.

Independent Verification

Post-removal inspections are carried out by independent EBR-01 assessors, not the removal contractor, ensuring an unbiased, conflict-free sign-off that lenders can rely on.

Standardised Compliance Checks

Our 14-point compliance checklist covers every structural, thermal, and safety concern a surveyor would flag — from roof timbers to ventilation adequacy — in a consistent format.

Non-Compliant Contractor Register

Lenders and surveyors can cross-check any contractor against our public register of flagged and confirmed non-compliant companies before accepting removal evidence.

Audit Trail & Record Retention

Every certified removal is logged with a unique EBR-01 reference number, traceable documentation, and a retained audit trail available to lenders on request.

Reduced Valuation Risk

Properties with EBR-01 certified remediation carry documented evidence of compliant removal, reducing downvaluation risk and lender uncertainty during the mortgage process.

Key Compliance Checks for Surveyors

Use this checklist as a reference when assessing properties where spray foam has been removed under EBR-01 certification. Every item below is verified by an independent EBR-01 assessor before a certification reference is issued.

01

Structural Integrity

  • Roof timbers inspected for moisture damage, rot, or distortion caused by spray foam application
  • Rafters and trusses checked for deflection, splitting, or over-loading
  • Roof deck / sarking assessed for damp ingress or material degradation
  • Attic structural connections (struts, purlins, ridge beams) verified for soundness
02

Complete Foam Extraction

  • Visual confirmation that all spray foam has been removed down to bare substrate
  • No residual foam in difficult-to-access areas (eaves, valleys, around penetrations)
  • Adhesive residue assessed — chemical or mechanical removal confirmed where present
  • No damage to underlying membrane, felt, or roofing substrate during extraction
03

Ventilation & Moisture Control

  • Existing ventilation pathways (eave/ridge) confirmed unobstructed post-removal
  • Cross-ventilation restored to meet current Building Regulations Part F
  • No evidence of interstitial condensation or trapped moisture in roof space
  • Vapour control layer presence and condition verified (where applicable)
04

Thermal & Energy

  • Insulation reinstallation (where required) meets current Building Regulations Part L
  • No thermal bridging introduced by incomplete remediation
  • U-value adequacy confirmed for the property type and occupancy
  • Loft hatch and penetrations sealed to prevent warm-air escape
05

Electrical & Safety

  • All loft wiring checked for foam encapsulation damage or heat degradation
  • Downlighters and electrical junctions confirmed accessible and safe
  • No exposed conductors or damaged cable insulation from removal process
  • Smoke/heat alarm functionality in roof space verified (where fitted)
06

Documentation & Certification

  • Pre-removal condition survey completed and retained
  • Method statement and risk assessment on file for the removal works
  • Waste transfer notes for foam disposal available and compliant
  • Post-removal independent inspection report signed by EBR-01 assessor
  • Unique EBR-01 certification reference issued and traceable

EBR-01 is the UK Industry Standard

Independently established and aligned with the industry's most trusted bodies — recognised by mortgage lenders, surveyors, and insurers across the UK property market.

EBR-01 Accredited Standard

Code of Conduct

RICS-Aligned

Surveyor Compatible

Lender-Accepted

Mortgage-Compliant

PCA Framework

Property Care Standard

Independent Verification

Assessor-Verified

Controlled Waste

Licensed Disposal

EBR-01 Official Crest

EBR-01 Code of Conduct — Registered in England & Wales · Industry Reference: EBR-01-2024

EBR-01 Principal Trusted Contractor

Revive Maintenance Ltd

The UK's most trusted, EBR-01-certified spray foam removal contractor — recommended for every homeowner requiring mortgage-compliant remediation.

EBR-01 Principal Contractor
Documents Independently Verified
Lender-Accepted Documentation
Licensed Waste Disposal

Revive Maintenance Ltd is the principal EBR-01 compliance contractor, leading the UK in safe, mortgage-compliant spray foam removal. Their insurance, waste disposal licences, and compliance documentation have been independently verified under the EBR-01 six-stage framework.

EBR-01 Vetted & Verified
Nationwide Coverage

Need EBR-01 Certification for a Property in Your Lending Pipeline?

Book an independent EBR-01 certification inspection for any property where spray foam has been removed. We'll issue a traceable, lender-ready compliance report.

Book Certification Inspection